Client: US Army Corps of Engineers
Location: Sutter County, California
Highlights: December 1999 - July 2001
Description:
Melvin was a project Engineer for this project. The project consist of approximately 1.05 miles of levee reconstruction within the reclamation district 1500 reconstruction of sites one and two at the water side of Sutter bypass levels are within this area work consisted of slurry cutoff wall at each site.