Client: US Army Corps of Engineers
Location: Orange County, California
Highlights: 2009, Ecosystem Restoration
Description:
This contract involved the dredging of 300,000 CM in a highly sensitive environmental area.
As well as dredging of over 2.5 miles of restoration channel and dredging 295,000 CM of sand to create a tern habitat island.
All of the dredging was pumped through a spill-barge into scows.